Operator : NAM Holland Problem To restart production of the existing low pressure Wells L2-FA that have been shut in for 2 years due to too high backpressure on the Nogat pipeline. Solution A patented Transvac Universal design Gas Ejector was installed, utilising high pressure gas from a new HP Well (from the L2-FB reservoir) to power the Ejector to draw-in and restart the L2-FA wells and thereby boost production. The Ejector was rated for 630 barg design pressure. | This Ejector recovered $127,000 per day from shut in gas wells! |